top of page

REFERENCES

Please find below the reference letters from my former managers and co-workers.

Additionally you can scan through my achievements and recognition awards.

Reference letters

Gordon F Jewess

Head of Engineering

Hamilton Sundstrand Poland (formerly)

Pratt & Whitney AeroPower

Chung Wong

Senior Mechanical Engineer

Pratt & Whitney AeroPower

H. Victor Arrieta

Senior Manager Engine Component Development

MTU Aero Engines Polska

Rewards and Recognition

Engineering  Design  Center  Rewards  &  Recognition award  - Customer Determines Our Success - This award recognizes Hubert Bosak's efforts in providing excellent support to HF120 Program what is well received and appreciated by the Program Management. (9/4/2017)

Engineering  Design  Center  Rewards  &  Recognition award  - Customer Determines Our Success - This is to recognize Hubert''s support to HF120 engine production, leadership and ownership of BGA Engineer On-duty process. (6/20/2017)

Engineering  Design  Center  Rewards  &  Recognition award  - Customer Determines Our Success - This award is to recognize Hubert Bosak for building great relationship and thrust with the Manufacturing Programs team and support HF120 Program. (2/10/2017)

Engineering  Design  Center  Rewards  &  Recognition award  - Deliver Results In An Uncertain World

Thank you for showing expertise, flexibility and dedication in providing manufacturing support for CF6 LPT Nozzles - Avio Aero Pomigliano in 2015 (2/24/2016)

 

Engineering Recognition Day 2016

Nominee in category: MATERIALS & MANUFACTURING - MRB reduction for CF6 LPT Nozzles in Avio Aero Pomigliano

 

GE Aviation Bronze award - Customer determine our success - Thank you for your outstanding support, self-motivation, flexibility/adaptation and leadership to help Avio Aero Pomigliano in achieving third quarter delivery goals. (10/14/2015)

 

Engineering  Design  Center  Rewards  &  Recognition award - Thank you for your outstanding support, self-motivation, flexibility/adaptation and leadership shown in supporting CF6 LPT Nozzles MRB backlog reduction in Avio Aero Pomigliano (4/21/2015)

 

Engineering  Design  Center  Rewards  &  Recognition award to recognize Hubert Bosak for his leadership of LPT Small Commercial&Military team and successful completion of HMax PT Airfoils and Shrouds Preliminary Design Review with an excellent result within limited time and huge technical constraints (12/3/2014)

 

Engineering  Design  Center  Rewards  &  Recognition award to recognize Hubert Bosak’s leadership of the EDC HMax Fast Demo PT Airfoils and Shrouds design team . The team successfully completed a Conceptual Design Review within limited time and significant technical constraints (10/14/2014)

 

Engineering  Design  Center  Rewards  &  Recognition  award  to  recognize  the  HF120  LPT  Cost Reduction  design  team  for  its  outstanding  efforts  to  complete  the  Detailed  Design   Review (100% score) within limited time and huge technical constraints (6/26/2013)

 

Engineering Recognition Day 2013 

Engineering Process Excellence Award – HF120 LPT cost reduction project

This project is the largest cost reduction project on Honda engine. All tasks were performed with the highest quality. Cooperation between many teams across whole EDC was exemplary. Our efforts were appreciated  by  CEO  during  reviews.  The  best  description  of  our  customer  oriented  work  can  be characterized by the following opinion given by Robert Czachor: "The redesign is being executed by 

the EDC team, who are to be complimented on a thorough job of both design and in addressing the action items from previous reviews. As a consequence, actions from the present review are relatively minor" (24/4/2013)

 

Engineering  Design  Center  Rewards  &  Recognition  award  for  Outstanding  Design  Support presented during HF120 Honda LPT Redesign for Part Cost and Durability PDR. Under an aggressive schedule  quick  self-familiarization  with  the  project  and    preformation  of  the  analyses  required  for successful PDR review completion (11/26/2012)

 

Engineering Team of the Year nominee for Hamilton Sundstrand Rzeszow Engineering Team (2/2012)

 

© 2015 by HUBERT BOSAK. Proudly created with Wix.com

  • s-facebook
  • s-linkedin
bottom of page